Strata power supply upgrade in North Sydney: what building committees need to know
How strata buildings in North Sydney upgrade their network supply for EV charging, electrification and ageing mains, and how committees can plan the work.
North Sydney has more apartments and townhouses than almost anywhere outside the CBD. Many buildings, from 1960s walk-ups in Neutral Bay and Kirribilli to 1980s and 90s blocks in Crows Nest and St Leonards, were designed with supplies sized for a different time. Now owners want EV chargers in the car park, building committees are talking about electrification, and some original consumer mains are reaching the end of their life. A strata power supply upgrade is how a building catches up.
Why buildings need upgrades
- EV charging. One or two chargers may fit. Twenty will not, without planning.
- Electrification. Replacing gas hot water or cooking with electric adds significant load.
- Air conditioning. Buildings that never had it now have split systems in every unit.
- Ageing mains. Original consumer mains and main switchboards are often decades old.
- Renovations. Units being renovated add load one by one until the main supply is at its limit.
Step 1: Understand current capacity
Before anything else, the building needs to know how much capacity it has and how much it uses. An electrician can carry out a load study using maximum demand data. This tells the committee how much headroom is left.
Step 2: Decide what the building wants
Is the goal EV charging for a few owners, or every space? Is the building going all-electric? Are some units adding air conditioning? The answer shapes the size of the upgrade.
Step 3: Consider load management
For EV charging, load-managed systems share available capacity between chargers. They can allow more chargers without a full supply upgrade. Your electrician and EV installer can advise.
Step 4: Plan the network side
If the building needs more capacity, the network side may involve:
- An application to Ausgrid for increased capacity
- New, larger consumer mains, a consumer mains upgrade on a bigger scale
- A three phase power upgrade for smaller buildings still on single phase
- In some cases, network works such as a new substation, which Ausgrid assesses
Step 5: Approvals
Strata buildings need the owners corporation’s approval for common property works. Committees should allow time for quotes, a general meeting resolution and any by-laws, especially for EV charging.
Step 6: Plan the outage
Most supply upgrades need a planned outage for the whole building. Owners and tenants need plenty of notice. We schedule outages to minimise disruption, often early on a weekday, and work with the strata manager on notices. See power disconnection and reconnection for how isolations work.
Who does what
The strata manager coordinates approvals and notices. The building’s electrician designs the main switchboard and distribution. We handle the network side: the Ausgrid application, consumer mains and connection. An EV installer handles chargers and load management.
Townhouse complexes
Smaller townhouse complexes may have each dwelling supplied separately, or share a common supply. The approach depends on how the complex was built. We check the arrangement on site.
Emergencies
If a building’s main supply fails or is damaged in a storm, our emergency level 2 electrician service attends and provides a written report for the strata manager and insurer.
Costs
Costs range widely, from a straightforward mains upgrade to major works involving the network. A load study is the starting point for any estimate.
Common mistakes
Approving chargers one at a time. Each owner’s charger seems small until the building’s capacity runs out.
Skipping the load study. Guessing capacity leads to tripped supplies or wasted money.
Short notice for outages. Residents need time to plan around a building-wide outage.
Forgetting future needs. Upgrading for today’s chargers only, then repeating the work in a few years.
Older walk-up buildings
Three and four storey walk-ups from the 1950s to 70s are common around Neutral Bay, Kirribilli and Cremorne. Many still have their original main switchboard and consumer mains, often in a small meter room or under the stairs. Before adding EV chargers or electrifying, these buildings usually need the mains and main board reviewed. It’s often the oldest electrical equipment in the building, and the part every unit depends on.
Records and documentation
A good upgrade leaves the building with clear records: what capacity it has, where the mains run, what was replaced and when. Keep them with the strata roll. Future committees, buyers and electricians will thank you.
Ausgrid timeframes
Applications for increased capacity can take time, especially where network works are needed. Lodge early, and don’t promise owners chargers until the capacity is confirmed.
Who to call first
Start with your strata manager. They’ll coordinate the electrician, the committee and us, and keep owners informed.
Getting help
Committees and strata managers can call the North Sydney level 2 electrician team to talk through the network side. If you own a terrace rather than a unit, read our terrace power upgrade guide.
Updated
Strata power supply upgrade in North Sydney: common questions
Something else on your mind? Call 02 9158 9917 and ask.
Who pays for a strata supply upgrade?
Usually the owners corporation, as it's common property. Your strata manager can confirm.
Can every owner have an EV charger?
Only if the building's supply can carry the load. A load study tells you, and load management can help.
How long is the building without power?
Usually a planned outage of a few hours, scheduled well in advance.